Melbourne's West · Fixed price

Renovations. Keep the house, change how it works.

Some homes are worth keeping and just need to work differently. Structural extensions and whole home transformations, finished to the standard of the homes we build new.

Book a Free Site AssessmentOr call +61 468 043 6854.3 on Google from 24 reviews

Is it the right move

Three honest ways to know.

A renovation is the right answer when the problems are in the layout rather than in the bones. When they are in the bones, it stops being the cheaper option, and that is the line we will help you find.

A contemporary extension joined to an original cottage
The part worth keepingThe part that changes
01

The house is solid, the layout is not

Good bones, sound structure, and rooms in the wrong places.

Tell me more

Plenty of homes in the west were built well for a family that lived differently. Opening the back, moving the kitchen or adding a room can fix twenty years of frustration without touching what already works.

02

You need more room, not a different street

Another bedroom, a proper living space, somewhere to work.

Tell me more

An extension keeps the location, the school zone and the neighbours, and adds the space the family actually grew into. Usually less disruptive than moving, and it keeps the equity in a place you already like.

03

And when it is not the answerThe honest one

Past a certain point, rebuilding costs less and gives you more.

Tell me more

When the stumps, the wiring, the plumbing and the roof all need doing, you can spend more on a renovation than a new home would cost and still have an old house around it. If your house is on that side of the line we will say so, and a knockdown rebuild may be the better answer.

The full picture

What a renovation actually involves.

You will not find a dollar figure on this page. Renovations vary more than any other kind of build, because every one of them starts with a house somebody else made decisions about.

What we can give you is the list, including the parts that only show up once a wall comes off.

Renovations carry more unknowns than a new build, and pretending otherwise is how people end up with variations they did not expect. We open the house up before we fix the price wherever we can.

Timber roof framing during constructionLine 04 · Building
Every line, namedNo numbers, on purpose
01

Checking what is holding it up

What is load bearing, and what the stumps and frame are really like.

Tell me more

Before anything is designed, we work out what carries the house. It decides what can be opened up, what has to be replaced, and it is where renovation budgets most often move.

02

Asbestos checks

Homes built before 1990 get tested before anything is opened up.

Tell me more

It turns up in eaves, wall sheeting, wet areas and old flooring. Licensed specialists remove what is found. Standard, managed, and far better known about early.

03

Council approval

Most structural work and extensions need a permit.

Tell me more

What is needed depends on what you are changing and where. Some blocks carry extra rules covering heritage, the character of the street or trees, and those shape what is possible.

04

The building work

Extension, structural changes, and the finishes through the whole home.

Tell me more

Finished to the same standard as our new builds. Where a renovation meets an existing home badly, it looks like a renovation forever, so the join is where the care goes.

05

Wiring, plumbing and heating

Older services usually have to be brought up to current standards.

Tell me more

Once walls are open, wiring and plumbing that were legal decades ago often cannot be reconnected as they are. Worth budgeting for rather than discovering.

06

Living through it

Whether you can stay depends on what is being done, and it has its own section.

Tell me more

Some renovations you can live through. Some you genuinely cannot. Which one yours is gets decided at the assessment, not halfway through.

The process

Five stages, on a house that already exists.

The same five stages as every Zaman build, with one difference: we spend longer working out what is already there before anything is drawn.

A Zaman home under construction
One team, start to finishStage 04 · Build
01

Consult

We walk the house with you and work out what is worth keeping.

02

Design

Designed around the structure that stays, then approved.

03

Fixed price

Signed before work starts, with the unknowns named honestly.

04

Build

Built by one team, with one point of contact throughout.

05

Handover

We walk every room together and hand over the warranty.

The unspoken question

Can you live in it while it happens?

Sometimes yes, sometimes genuinely not, and the answer depends on what is being done rather than on how tough you are. No builder puts this on their website, so here it is plainly.

We give you a straight answer at the assessment, before the design is finished, so it can shape the plan instead of ambushing it.

Kitchen of a completed Zaman home, stone island and black marble splashback
The other end of itProject Nadir · Tarneit
01

Adding on at the back

Usually liveable, if noisy, until the two parts are joined.

Tell me more

An extension built off the existing home can often go up while you stay. The hard stretch is when the old and new are opened into each other, which is worth planning around.

02

Structural work through the middle

Usually not liveable. Power, water and walls all come and go.

Tell me more

When load bearing walls, the roof or the services are being reworked, the house stops functioning as a house. Moving out for that stretch is normally cheaper than living badly through it.

03

Staging it

Some renovations can be split so you always have a working part.

Tell me more

Not always possible, and it usually costs more overall because trades come through twice. When staying put matters more than finishing fast, it can be the right trade, and we will price both so you can choose.

Real projects

Homes we have built.

Real homes, real suburbs, real photographs, and the owner's permission on record. We do not publish anything else. Every home below has its own page, and the renovation projects are being gathered with their before photos.

See every home we have photographed

Fixed price, covered

The price we agree is the price you pay.

Renovations carry more unknowns than any other kind of build, which makes it more important, not less, that the ones we can see are priced and the ones we cannot are named. The full detail lives on one page.

The Zaman Fixed Price Promise
  • A fixed price building contract before work starts

  • Every inclusion itemised in writing

  • The unknowns named honestly rather than left to arrive as variations

  • First Resort Home Warranty cover where the work requires it

Renovation questions

Asked at every site assessment.

The questions we hear most from owners deciding whether to change the house or replace it.

01

Is renovating cheaper than rebuilding?

Up to a point, yes. Past that point it stops being cheaper and you still have an old house wrapped around new work. The line sits roughly where the stumps, wiring, plumbing and roof all need doing at once. We will tell you honestly which side of it your house is on, even when the answer costs us the renovation.

02

Do we need council approval?

Usually, for structural changes and extensions. What is required depends on what you are changing and where the house is, and some blocks carry extra rules covering heritage, the character of the street or trees. We check what applies before anything is designed.

03

How do you price a renovation when you cannot see inside the walls?

We open up and investigate what we can before the price is fixed, and we name the things we genuinely cannot know until work starts rather than burying them. A renovation quote with no unknowns listed is not a more certain quote, it is a less honest one.

04

Will the new part look like an add on?

Only if it is designed like one. The join between old and new is where a renovation is judged, so that is where the attention goes, in the roofline, the floor levels and the way light moves between the two. It is also the part that is hardest to fix later.

05

Our house is old. What about asbestos?

Homes built before 1990 are inspected before anything is opened up, and anything found is removed by licensed specialists. It is a normal, managed part of renovating an older home. It only becomes a problem when a builder leaves it out of the conversation until it arrives as an extra cost.

06

Can we stay in the house while you work?

Sometimes. It depends on what is being done rather than on how much you are willing to put up with. Extensions off the back are often liveable; structural work through the middle usually is not. The section above sets out the three realistic patterns and we will tell you which one your project is at the assessment.

Entry hallway of a completed Zaman home

Still have one?

Ask it at the free site assessment.

We come to you, we look at the house, and you get straight answers about your block. It costs nothing and commits you to nothing.

Or call +61 468 043 685
4.3 on Google from 24 reviews

Start your renovation

Every renovation starts with a look at the house.

Free, no obligation. You deal with the builder directly.

4.3 on Google · Melbourne west families
01 / 05

What are you planning?

Takes about 45 seconds.

Prefer to talk now?

+61 468 043 685

Mon–Fri 7am–5pm · Sat by appointment